|
KA not JoulesEnergy (Joule) Ratings Are NOT Recognized
![]() Table A.8 illustrates an excerpt from IEEE C62.41.1-2002 page 63, showing that energy deposited into MOVs actually decreases upon reaching certain levels. This is a result of upstream ‘flashover’, a physical limitation of all distribution systems. Shaded cells indicate decreased Joules. 2. Joule determinations are open to interpretation or questionable usage. By definition, Energy is defined as Power x (multiplied by) Time. In this context, how are Power and Time defined and where are Watts actually going? Moreover, are Watts the amount of power that the SPD is exposed to (i.e. impulse size), the power passed through the SPD, or heat absorbed inside the SPD? Each of these is substantially different. For example, the first calculation below shows Joules when the SPD gets ‘clobbered’ by IEEE C62.41’s most severe surge. The second calculation shows trivial leakage currents for a little over six months. Joule ratings are the same but the stress on the SPD is very different. • Assume IEEE worst case surge: C High - 10,000V, 10,000A, 20µs duration: J= W•s = V•A•s = 10,000V x 10,000A x 20µs = 2,000J • Assume 1µA leakage current through 120V MOV(s) for 193 days: J= W•s = V•A•s = 120V x 1µA x 193 days = 2,001J In another example or Furthermore, can the SPD sustain a “Joule rating” many times, one time, or does it define failure? At least one manufacturer uses a “multiplier”. For example or More specifically, if an MOV is rated 1J, but can withstand 5,000 hits, the SPD is rated 1J x 5,000 = 5,000 Joules. In summary, Joule ratings are not recognized by surge suppression Standards due to ambiguity. |
© 2010 PQ Global.
All Rights Reserved |
|